-
Federal
CalWave Revised IO&M Plan - CalWave Open Water Demo
Department of Energy —
Revised IO&M Plan for CalWave's open water demonstration at Scripps Institution of Oceanography for the open water demonstration to be conducted in collaboration... -
Federal
SeaRAY WEC Preliminary Design and Test Planning
Department of Energy —
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This... -
Federal
StingRAY WEC Risk Register
Department of Energy —
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL. -
Federal
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Department of Energy —
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1... -
Federal
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine
Department of Energy —
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The... -
Federal
Advanced TidGen Power System - Summary Presentation
Department of Energy —
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power... -
Federal
Advanced TidGen Power System - ORPC Public Technical Report, Device Design
Department of Energy —
Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System. -
Federal
Advanced TidGen Power System - Preliminary IO&M and Testing Plan
Department of Energy —
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power...