Content deleted Content added
→top: ce |
Removed URL that duplicated unique identifier. Removed parameters. | You can use this tool yourself. Report bugs here. |
||
Line 31:
When changing over from single and/or multi-phase infeed low-voltage meshed networks to isolated networks, load-flow calculation is essential for operational and economical reasons. Load-flow calculation is also the basis of all further network studies, such as motor start-up or investigation of scheduled or unscheduled outages of equipment within the outage simulation.
Especially when investigating motor start-up,<ref>{{Cite journal|last=Hui|first=Zhu|year=2014|title=The Simulation Analysis of Motor Startup Based on the ETAP Platform
==Short circuit analysis==
Line 128:
#Generation expansion optimization
#Transmission expansion optimization
#Generation-transmission expansion co-optimization<ref>{{cite journal|last1=You|first1=Shutang|last2=Hadley|first2=Stanton W.|last3=Shankar|first3=Mallikarjun|last4=Liu|first4=Yilu|title=Co-optimizing generation and transmission expansion with wind power in large-scale power grids—Implementation in the US Eastern Interconnection|journal=Electric Power Systems Research|date=1 April 2016|volume=133|pages=209–218|doi=10.1016/j.epsr.2015.12.023
#Distribution network optimization
|