Power system simulation: Difference between revisions

Content deleted Content added
GreenC bot (talk | contribs)
Rescued 1 archive link. Wayback Medic 2.5
m Unit commitment: Adding/removing wikilink(s)
Line 42:
 
==Unit commitment==
The problem of [[unit commitment]] involves finding the least-cost dispatch of available generation resources to meet the electrical load.
 
Generating resources can include a wide range of types: