Looop through GEDI granules
Posted: Wed Aug 09, 2023 11:08 am America/New_York
Hi,
Please, is there a way to loop through processing gedi granules? I have a lot of granules (e.g. 36 granules per year) to extract RH @98 and some vertical height metrics from L2A and L2B products. How can I do this function in a loop for each year to process all granules at once instead of processing it per granule and per beam?
Please, is there a way to loop through processing gedi granules? I have a lot of granules (e.g. 36 granules per year) to extract RH @98 and some vertical height metrics from L2A and L2B products. How can I do this function in a loop for each year to process all granules at once instead of processing it per granule and per beam?