Cost estimate: Move data out of archive storage

This sample estimates the cost to move a portion of data from the archive tier to the hot tier before the 180 day limit.

Important

This estimate is based on these sample prices. Sample prices shouldn't be used to calculate your production costs. To find official prices, see Find the unit price for each meter.

Scenario

Your company stores 20 TB of data in the archive tier for long term retention. However, after only three months in archive storage, 20% of that data must be moved back to the hot tier. You are asked to estimate the cost to get that data from archive storage.

The storage account is located in the West US region, is configured for locally-redundant storage (LRS), and doesn't have hierarchical namespaces.

Costs

The following table describes each cost.

Cost Description
Change tier to hot First, blobs must be moved out of archive storage. To do this, administrators change the tier of each blob from archive to hot. All tools and SDKs use the Set Blob Tier operation to accomplish this task. That operation is billed as a read operation on the archive tier.
Data retrieval fee This meter applies to each GB moved from the archive tier and into an online tier such as the hot tier.
Early deletion fee If data is moved out of the archive tier before 180 days have transpired, a prorated early deletion fee is applied to the bill.

Estimate

Based on these sample prices, the following table shows how each cost component is calculated.

Cost Cost factor Calculation Value
Change tier to hot Number of Set Blob Tier operations 2000 blobs * 20% 400
Price of an archive read operation $0.00055
Cost to change tier to hot

400 operations * $0.00055 $0.22
Data retrieval fee Total file size 20,000 GB
Data retrieval size 20,000 GB * 20% 4,000
Price of data retrieval (per GB) $0.0220
Cost to retrieve

4,000 blobs * $0.0220 $88.00
Early deletion fee Rough number of months penalty (180 days - 90 days) / 30 days 3
Price per month of archive storage (per GB) $0.0020
Cost of early deletion

(4,000 blobs * $0.0020) * 3 $24.00
Total cost $0.22 + $88 + $24 $112.22