Grants talk:PEG/WM US-DC/Outreach 2013: Difference between revisions

Content deleted Content added
AWang (WMF) (talk | contribs)
report extension approved.
Line 31:
 
I would like to request an extension for submitting the grant report. Currently the report is due by March 1; I would like this extended to March 31. We are in the midst of preparing the report, and we have done a lot of work on it so far in our drafting space, but we are conducting an evaluation of projects funded by this grant. This evaluation includes surveying participants of past projects and learning about what we can do to better design and carry out future projects. We believe this evaluation will provide a more insightful report, but it will require some extra time. [[User:Harej|harej]] ([[User talk:Harej|talk]]) 21:29, 19 February 2014 (UTC)
: Approved. The report is due by 31 March 2014. [[User:AWang (WMF)|Alex Wang (WMF)]] ([[User talk:AWang (WMF)|talk]]) 22:47, 24 February 2014 (UTC)
Return to "PEG/WM US-DC/Outreach 2013" page.