{{Short description|Joint US Air Force-NASA study to replace the Titan, Atlas and Space Shuttle rockets}}
{{Refimprove|date=March 2017}}
Line 4 ⟶ 5:
==Background==
[[File:Space Launch System (16525420976).jpg|alt=rocket ship|thumb|An artist's rendering of the 2010s [[Space Launch System]], which contains some design heritage from the ALS]]
The ALS was a joint USAF and NASA study from 1987 to 1990. It was an endeavour of the years following the [[Space Shuttle Challenger disaster]]. Colonel John R. Wormington (retired Brigadier General USAF) was
The ALS program office
== Aims ==
The ALS program
The program had three main contractors, each with an $800 million multi-year contract. They were Boeing Aerospace, Martin-Marietta, and General Dynamics. The ALS program budget was just under $2.5 billion.
By 1989, the [[Presidency of George H. W. Bush|Bush Administration]] had inherited a plan for the development of the Advanced Launch System that called for the Defense Acquisition Board to approve the advanced development of the system in early 1990, leading to a first flight in 1998 and a full operational capability in 2000.<ref>Wolfe, M.G. et al, "The Advanced Launch System." 40th International Astronautical Federation Congress, Malaga Spain, 8–14 October 1989, IAF Paper 89-229.</ref> This effort would lead to the development of a modular family of [[Launch vehicle|launch vehicles]], with a payload capacity to low Earth orbit ranging from 5,000 kilograms to 200,000 kilograms, that would replace existing expendable launch vehicles in the 2000-2005 time frame.<ref>Branscome, D.R., "The United States Space Transportation Survey," Proceedings of the 2nd European Aerospace Conference on Progress in Space Transportation, (European Space Agency, ESA SP-293, August 1989), pages 39-44.</ref>▼
== Progress ==
▲