Content deleted Content added
Hazlenut101 (talk | contribs) Tag: Reverted |
Reverted 1 edit by Paradigmconsultingengineer (talk): Spam |
||
(15 intermediate revisions by 12 users not shown) | |||
Line 28:
{{Main|Geotechnical investigation}}
Geotechnical engineers investigate and
Geotechnical engineers and engineering geologists perform geotechnical investigations to obtain information on the [[Physical property|physical properties]] of soil and rock underlying
Surface [[exploration]] can include on-foot surveys, [[
[[Geotechnical centrifuge modeling]] is another method of testing physical
=== Foundation design ===
{{Main|Foundation (engineering)}}
The foundation of a structure's infrastructure transmits loads from the structure to the earth. Geotechnical [[engineer]]s design foundations based on the load characteristics of the structure and the properties of the soils and [[bedrock]] at the site.
=== Earthworks ===
[[Image:Seabees compactor roller.jpg|thumb|A [[compactor]]/[[road roller|roller]] operated by U.S. Navy Seabees]]
{{See also|Earthworks (engineering)}}Geotechnical engineers are also involved in the planning and execution of [[Earthworks (engineering)|earthworks]], which include ground improvement,<ref name="Han 2015" /> slope stabilization, and
====Ground improvement====
Various geotechnical engineering methods can be used for ground improvement, including reinforcement [[geosynthetics]] such as geocells and geogrids, which disperse loads over a larger area, increasing the soil's load-bearing capacity
====Slope stabilization====
Line 54:
{{Main|Slope stability}}
Geotechnical engineers can analyze and improve
=====Slope stability analysis=====
{{Main|Slope stability analysis}}
Stability analysis is needed
== Sub-disciplines ==
Line 84:
==Observational method==
First proposed by [[Karl Terzaghi]] and later discussed in a paper by [[Ralph Brazelton Peck|Ralph B. Peck]], the observational method is a managed process of construction control, monitoring, and review, which enables modifications to be incorporated during and after construction. The
The observational method may be described as follows:<ref name="peck" />
Line 90:
# General exploration sufficient to establish the rough nature, pattern, and properties of [[Deposition (geology)|deposits]].
#Assessment of the most probable conditions and the most unfavorable conceivable deviations.
#Creating the design based on a working hypothesis of behavior anticipated under the most
#Selection of quantities to be observed as construction proceeds
#Selection, in advance, of a course of action or design modification for every foreseeable significant deviation of the observational findings from those predicted.
#Measurement of quantities and evaluation of actual conditions.
#Design modification
The observational method is suitable for construction that has already begun when an unexpected development occurs
== See also ==
{{Portal
{{Div col|small=yes}}
* [[Civil engineering]]
Line 114:
* [[Land reclamation]]
* [[Landfill]]
* [[Mechanically stabilized earth]]
* [[Offshore geotechnical engineering]]
Line 124 ⟶ 123:
* [[Soil science]]
{{Div col end}}
==Notes==
Line 131:
* Bates and Jackson, 1980, Glossary of Geology: American Geological Institute.
* Krynine and Judd, 1957, Principles of Engineering Geology and Geotechnics: McGraw-Hill, New York.
*
* Pierfranco Ventura, Fondazioni, Applicazioni: Verifiche Statiche e Sismiche Strutture-Terreni, vol. II, , Milano, Hoepli, 2019, pp.749,ISBN 978-88-203-8645-0 https://www.hoeplieditore.it/hoepli-catalogo/articolo/fondazioni-modellazioni-pierfrancventura/9788820386443/1451
{{Col-begin}}
{{Col-2}}
|