Line 67:
During this era, the highway is completed in sections. The first section to be fully completed is the section between Tangerang and Jakarta, this section was completed in 1984. Two years later, the section between Surabaya and Gempol (near [[Pasuruan]]. Semarang Outer Ring Road was the next section to be fully opened (after having sections of it partially opened starting from 1983), opened in 1988. The next major section to be fully operational is the [[Jakarta-Cikampek Toll Road|Jakarta-Cikampek]] section, spanning 72 km, this highway would become one of the most important and most used highway in Indonesia, as it is the fastest link between Jakarta and cities in eastern West Java, Central Java, and East Java. The Tangerang-Merak section is next to be completed, also spanning 72 km, this section was opened in 1992, fully connecting the Port of Merak with Jakarta, although links further east and south is not yet available through toll roads. Following the completion of the Tangerang-Merak section, construction along this network stagnated.<ref>{{cite web |last1=Risanto |first1=Risto |title=Megaproyek Tol Trans Jawa, Dimulai dari Era Soeharto, Dihidupkan Kembali Oleh SBY Hingga Dituntaskan Jokowi |url=https://poskota.co.id/2021/05/06/megaproyek-tol-trans-jawa-dimulai-dari-era-soeharto-dihidupkan-kembali-oleh-sby-hingga-dituntaskan-jokowi |website=poskota.id |publisher=Pos Kota |access-date=29 December 2022}}</ref>
In 1995, Soeharto proposed
Following [[Post-Suharto era in Indonesia|Reformasi]], constructions of toll roads continue to stagnate, remarkably, no toll road in this corridor is completed during the first few years of Reformasi. During the presidency of [[Susilo Bambang Yudhoyono]] formed ''Badan Pengurus Jalan Tol'' (lit. Highway Operator Board). Following the formation of this board, highway construction, especially in this corridor continued, starting with the completion of several sections of the Jakarta Outer Ring Road and the 33 km Kanci-Pejagan section creating the first highway link between West Java and Central Java, several sections along the Surabaya-Mojokerto section was also completed during this period.<ref name=":0" />
Line 292:
=== Semarang–Demak Toll Road ===
On September 23, 2019, a concession to PT Pembangunan Perumahan Semarang Demak signing has been done for building 27 kilometers Semarang Demak Toll Road. The toll road will be also functioned as embankment to avoid
==Impact==
|