Content deleted Content added
m v2.05b - Bot T20 CW#61 - Fix errors for CW project (Reference before punctuation) |
Jnestorius (talk | contribs) |
||
(One intermediate revision by one other user not shown) | |||
Line 5:
OAT elaborates upon and compartmentalises operational aspects of acceptance testing.<ref>{{Cite web |title=atos-operational-acceptance-testing-whitepaper.pdf |url=https://atos.net/wp-content/uploads/2017/01/atos-operational-acceptance-testing-whitepaper.pdf }}</ref>
According to the International Software Testing Qualifications Board (ISTQB), OAT may include checking the [[backup]]/restore facilities, IT [[IT disaster recovery|disaster recovery]] procedures, maintenance tasks and periodic check of security vulnerabilities.,<ref>ISTQB http://istqbexamcertification.com/what-is-acceptance-testing/</ref> and whitepapers on ISO 29119 and Operational Acceptance by Anthony Woods,<ref name="ISO 29119 OAT">{{cite document|author=Anthony Woods|title=Operational Acceptance - an application of the ISO 29119 Software Testing standard|date=2015|publisher=Capgemini and Sogeti|pages=1–12}}</ref> and ISO 25000 and Operational Acceptance Testing by Dirk Dach et al., OAT generally includes:<ref>White Paper: Operational Acceptance Testing, Business Continuity Assurance. December 2012 Dirk Dach, Dr Kai-Uwe Gawlik, Mark Mevert</ref>
* Component Testing
Line 46:
* Assess operability and supportability of the system.
For running the OAT [[test case (software)|test case]]s, the tester normally has exclusive access to the system or environment. This means that a single tester would be executing the test cases at a single point of time. For OAT the exact '''Operational Readiness''' quality gates are defined: both entry and exit gates. The primary emphasis of OAT should be on the operational stability, portability and reliability of the system.
==References==
|