Great Orme Tramway: Difference between revisions

Content deleted Content added
Duncharris (talk | contribs)
No edit summary
Monkbot (talk | contribs)
m Task 20: replace {lang-??} templates with {langx|??} ‹See Tfd› (Replaced 1);
 
(273 intermediate revisions by 96 users not shown)
Line 1:
{{Short description|Cable tramway in North Wales}}
[[image:Great_Orme_Tramway_and_cars_in_the_way.jpg|thumb|Two cars passing at a passing loop]]
{{Use dmy dates|date=October 2016}}
The '''Great Orme Tramway''' ([[Welsh language|Welsh]]: ''Tramffordd y Gogarth'') is a cable-driven tramway in [[Llandudno]] in north [[Wales]].
{{Infobox rail line
| box_width =
| name = Great Orme Tramway
| color =
| logo =
| logo_width =
| image = GOT Tram 4 Descending 05-07-17 04.jpeg
| image_width = 280px
| caption =
| type = [[Funicular]]
| system =
| status = Operational
| locale = [[Llandudno]], [[Wales]]
| coordinates = {{Coord|53.3321|N|3.8544|W|type:landmark_region:GB|display=title,inline}}
| start =
| end =
| stations = 3 open + 3 disused<ref name=tramcentenary />{{rp|9}}
| routes =
| daily_ridership =
| open = 1902
| close =
| owner =
| operator = [[Conwy County Borough Council]]
| character =
| depot = Halfway Station depot
| stock =
| linelength =
| tracklength =
| tracks = [[Single-track railway|Single track]] with [[passing loop]]
| gauge = {{track gauge|3ft6in|lk=on}}
| minradius =
| electrification =
| maxincline =
| racksystem =
| speed = {{convert|5|mph|km/h|0|abbr=on}}<br> running speed<ref name=tramcentenary />{{rp|9}}
| elevation =
| map = {{Great Orme Tramway|inline=1}}
| map_state = expanded
}}
The '''Great Orme Tramway''' ({{langx|cy|Tramffordd y Gogarth}}) is a cable-hauled {{track gauge|3ft6in}} gauge [[tram]]way in [[Llandudno]] in north [[Wales]]. Open seasonally from late March to late October, it takes over 200,000 passengers each year from Llandudno Victoria Station to just below the summit of the [[Great Orme]] headland. From 1932 onwards it was known as the '''Great Orme Railway''', reverting to its original name in 1977.<ref name=ohist>{{cite web|url=http://www.greatormetramway.co.uk/en/history |title=History |publisher=Great Orme Tramway |access-date=14 November 2016 |archive-url=https://web.archive.org/web/20161114131304/http://www.greatormetramway.co.uk/en/history |archive-date=14 November 2016 |url-status=live |df=dmy-all }}</ref><ref>{{cite news |title=New Great Orme tram drivers take to the controls |url=https://www.bbc.co.uk/news/uk-wales-39752810 |work=BBC News |publisher=[[BBC]] |access-date=3 May 2017}}</ref>
 
It is [[Great Britain]]'s only remaining cable-operated street tramway, and one of only a few surviving in the world, and it is owned by [[Conwy County Borough Council]]. The line comprises two sections, where each section is an independent [[funicular]] and passengers change cars at the Halfway station. Whilst the upper section runs on its own right of way and is similar to many other funicular lines, the lower section is an unusual street-running funicular.
The tramway uses a small fleet of blue tramcars, which are cable-driven. The overhead wire is used for communication between the tram and the driver in charge of winding the drum, though this has now been replaced with a radio system.
 
Whilst the street running section resembles the better-known [[San Francisco cable car system|San Francisco cable cars]], its operation is quite different in that it adheres to the funicular principle where the cars are permanently fixed to the cable and are stopped and started by stopping and starting the cable, unlike San Francisco where cars attach to, and detach from, a continuously running cable. As such, this section's closest relatives are Lisbon's [[Elevador da Glória|Glória]], [[Elevador da Bica|Bica]], and [[Elevador do Lavra|Lavra]] street funiculars.
The tramway has three main stations, one at the bottom of Great Orme, one in the centre aptly named 'Halfway' and one at the top of Great Orme.
 
==History==
== External links ==
[[File:Great Orme Railway - upper section - geograph.org.uk - 1607124.jpg|thumb|left|Tram 7 in 1968, carrying the ''Great Orme Railway'' livery and name of that time]]
{{Infobox UK legislation
| short_title = Great Orme Tramways Act 1898
| type = Act
| parliament = Parliament of the United Kingdom
| long_title = An Act for incorporating the Great Orme Tramways Company and for authorising the Company to make and maintain a Tramway and Tramroad from Llandudno to or near the summit of the Great Ormeshead in the county of Carnarvon.
| year = 1898
| citation = [[61 & 62 Vict.]] c. xxvii
| introduced_commons =
| introduced_lords =
| territorial_extent =
| royal_assent = 23 May 1898
| commencement =
| expiry_date =
| repeal_date =
| amends =
| replaces =
| amendments =
| repealing_legislation =
| related_legislation =
| status =
| legislation_history =
| theyworkforyou =
| millbankhansard =
| original_text = https://www.legislation.gov.uk/ukla/Vict/61-62/27/pdfs/ukla_18980027_en.pdf
| revised_text =
| use_new_UK-LEG =
| UK-LEG_title =
| collapsed = yes
}}
Authority to build the tramway was granted by the '''{{visible anchor|Great Orme Tramways Act 1898}}''' ([[61 & 62 Vict.]] c. xxvii), and construction started in 1901. The tramway was opened in its two stages: the lower section on 31 July 1902 and the upper on 8 July 1903.<ref>{{cite book |last1=Ellis |first1=Norman |title=Trams on Old Picture Postcards |date=1986 |publisher=Reflections of a Bygone Age |___location=Nottingham |isbn=0946245134 |page=47}}</ref> The original power house, at the Halfway station between the lower and upper sections, was equipped with winding gear powered by steam from [[Coke (fuel)|coke]]-fired boilers. Communication between the power house and the tram cars was provided by a telegraph system, operating over an overhead wire and [[trolley pole]]s on the cars.<ref name=kttgot>{{cite book | first=Keith |last=Turner |title=The Great Orme Tramway – over a century of service |publisher=Gwasg Carreg Gwalch |___location=Llanrwst |year=2003 |isbn=978-0-86381-817-2 |pages=65–68}}</ref><ref name=goou>{{cite web |author=Noel Walley |url=http://www.greatorme.org.uk/tramway.html |title=Llandudno Great Orme Tramway Conwy North Wales UK |publisher=Greatorme.org.uk |access-date=13 June 2013 |archive-url=https://web.archive.org/web/20130625015040/http://www.greatorme.org.uk/tramway.html |archive-date=25 June 2013 |url-status=dead |df=dmy-all }}</ref>
 
The line was initially provided with seven cars, three freight cars numbered 1 to 3 and four passenger cars numbered 4 to 7. The passenger cars were each named after a local Welsh Christian saint and are still in service. The freight cars were for the carriage of goods and parcels, as stipulated in the tramway's original act of Parliament, but were withdrawn from service by 1911. The freight vans were also used to carry coffins for burial at the church on Great Orme. There were two methods of using the freight tramcars: they could be placed on the track ahead of a passenger tram, and propelled up the incline, or the cable could be detached from a passenger tram and attached instead to a freight tram, which then operated alone up the incline. All seven trams were fitted with couplings that would have allowed the passenger trams to tow the freight trams, but there is no evidence that this type of operation ever actually occurred.<ref name=kttgot/><ref name=goou/>
* http://www.greatormetramway.com/
 
The line suffered a serious accident and consequent financial difficulties in the 1930s, resulting in its sale in 1935 to the Great Orme Railway company. In 1949, [[Llandudno Urban District Council]] exercised its power, granted by the original act of parliament, to buy the line. Ownership of the line has since passed to [[Aberconwy Borough Council]] and then [[Conwy County Borough Council]] as a result of local government reorganisations.<ref name=ohist/><ref name=goou/>
[[Category: Tram transport]]
 
[[cy:Tramffordd y Gogarth]]
The original steam power was replaced in 1958 by electrically powered apparatus. In 1977, the line reverted to the Great Orme Tramway name that it had carried before its sale in 1935. Between 1999 and 2001, the line received £1 million of funding from the [[European Union]], together with a further £1 million from the [[Heritage Lottery Fund]] and matching funds from its owner. As a result, in 2001, the entire Halfway station, its control room and its power plant were completely rebuilt and re-equipped. At the same time the overhead wire telegraph communication system was replaced with an induction-loop system.<ref name=ohist/><ref name=goou/>
{{clear left}}
 
==Operation==
===Route===
The tramway has three main stops, a lower station called [[Llandudno Victoria tram stop|Llandudno Victoria]] after the hotel that formerly occupied the station site, the aptly named [[Halfway (Great Orme) tram stop|Halfway stop]], and the [[Summit (Great Orme) tram stop|Great Orme Summit stop]]. Passengers must change trams at the Halfway stop as the upper and lower funicular sections are physically separate. The two sections operate independently, with two cars on each section. As one car is ascending, the other is descending, and they pass at [[passing loop]]s in the middle of each section.<ref name="raib2010">{{cite web|url=http://www.raib.gov.uk/cms_resources.cfm?file=/100816_R132010_Great_Orme.pdf |date=16 October 2010 |publisher=Rail Accident Investigation Branch |title=Collision on the Great Orme Tramway, 15 September 2009 |access-date=11 November 2013 |archive-date=11 November 2013 |url-status=live |archive-url=https://web.archive.org/web/20131111191424/http://www.raib.gov.uk/cms_resources.cfm?file=%2F100816_R132010_Great_Orme.pdf |df=dmy-all }}</ref>
 
The lower section is built in or alongside the public road and has gradients as steep as 1 in 3.8 (26.15%). The track throughout this section is laid as [[grooved rail]] within the road surface, and the cable lies below the road surface in a conduit between the rails. The bottom half of the section is single-track, but above the passing loop it has [[gauntlet track|interlaced double track]]. By contrast, the upper section is less steep, with a maximum gradient of 1 in 10 (10%). The track is laid on [[Railroad tie|sleepers]] and [[Track ballast|ballast]], and the cable runs between the rails as is normal for most funiculars. The track is single apart from a short double-track passing loop equipped with points actuated by the flanges of the passing cars. The rails are interrupted to accommodate the cable.<ref name="raib2010"/>
 
===Stations===
[[File:Great-Orme-Depot.jpg|thumb|One of the two engineering bays in the Halfway maintenance depot.]]
The Great Orme Tramway refers to all its fixed boarding and alighting locations as ''stations'' (not tram stops).<ref name=tramcentenary /><ref name=goou/><ref name=gothiw /> Three are currently in regular use, named Victoria Station, Halfway Station, and Summit Station.<ref name=tramcentenary />{{rp|9}} Three others, all request stops, are currently disused, namely Black Gate, Ty'n-y-Coed, and Killen's Hill stations.<ref name=tramcentenary />{{rp|9}}
 
As well as being the point at which passengers change cars, the Halfway stop is also the control centre for the line. The electric motors driving the cables that propel the cars are in the central building of the stop, as are the winchmen who control them. This in turn leads to a further difference between the two sections. With the drive at the top of the lower section, there are only two haulage cables, from the Halfway stop to each car. As the upper section has its drive at the bottom of the section, a third cable is needed that connects the two cars via a [[sheave]] at the Summit stop.<ref name=gothiw>{{cite web|url=http://www.greatormetramway.co.uk/en/how-it-works |title=How it works |publisher=Great Orme Tramway |access-date=14 November 2016 |archive-url=https://web.archive.org/web/20161114132212/http://www.greatormetramway.co.uk/en/how-it-works |archive-date=14 November 2016 |url-status=live |df=dmy-all }}</ref>
 
Halfway stop is also the ___location of the engineering depot, with access for trams from both upper and lower sections. Engineers have depot facilities for inspection and maintenance of the trams, including inspection pits.<ref name=tramcentenary>{{cite book |title=Great Orme Tramway Centenary Guide |first=Johanna |last=Firbank |edition=First |publisher=Conwy County Borough Council |year=2002 |isbn=1-84047-007-0}}</ref>{{rp|10}} Although there is no public access to the depot, some parts of both the depot and the control room can be viewed by passengers through internal glazing in the viewing area, whilst interchanging between upper and lower sections.<ref name=tramcentenary />{{rp|5}}
 
===Communication===
The line is controlled by a pair of winchmen, one per section and stationed in the Halfway power house, who control the speed and direction of rotation of the cable, and hence the cars attached to the cable. They are assisted by attendants on each car, who are in communication with the winchmen using an induction-loop radio system. Before the introduction of this radio system, messages were passed using an overhead wire telegraph and [[trolley pole]]s on the tram cars. The overhead wire has since been removed, but the cars still carry the trolley poles.<ref name=goou/><ref name=gothiw/>
 
===Fleet===
The tramway still operates entirely with original vehicles, dating from the line's opening.
{| class="wikitable"
!Tram number
!Tram name
!Type
!Entered Service
!Notes
|-
|align=center|1
|align=center|''No name''
|align=center|{{convert|16|ft|7|in|mm}} four-wheel freight tram car
|align=center|1902
|align=center|Withdrawn in (or by) 1911
|-
|align=center|2
|align=center|''No name''
|align=center|{{convert|16|ft|7|in|mm}} four-wheel freight tram car
|align=center|1902
|align=center|Withdrawn in (or by) 1911
|-
|align=center|3
|align=center|''No name''
|align=center|{{convert|16|ft|7|in|mm}} four-wheel freight tram car
|align=center|1902
|align=center|Withdrawn in (or by) 1911
|-
|align=center|4
|align=center|[[Saint Tudno|St Tudno]]
|align=center|{{convert|37|ft|mm}} bogie passenger tram car
|align=center|1902
|align=center|Still in service
|-
|align=center|5
|align=center|[[Tysilio|St Silio]]
|align=center|{{convert|37|ft|mm}} bogie passenger tram car
|align=center|1902
|align=center|Still in service
|-
|align=center|6
|align=center|[[Seiriol|St Seiriol]]
|align=center|{{convert|37|ft|mm}} bogie passenger tram car
|align=center|1902
|align=center|Still in service
|-
|align=center|7
|align=center|[[Saint Trillo|St Trillo]]
|align=center|{{convert|37|ft|mm}} bogie passenger tram car
|align=center|1902
|align=center|Still in service
|-
|}
 
==Incidents==
*The tramway suffered its only fatal accident on 23 August 1932, when a drawbar failure on car number 4 caused a derailment and subsequent collision with a wall, killing the tram's driver and a 12-year-old passenger; ten further passengers suffered serious injuries. The failure was apparently caused by the drawbar's manufacture from a steel alloy which was not suited to this type of use; a 1933 report also highlighted the fact that the emergency brakes did not function at the time of the crash. Following the accident the tramway was closed until 1934 while safety improvements were carried out, and reopened under new ownership after the original company was wound up.<ref>{{cite web|url=http://www.greatorme.org.uk/tramhistory.html |title=Significant Events in the History of the Line with brief notes on its construction, equipment and operation |author=Noel Walley |publisher=Greatorme.org.uk |access-date=27 July 2015 |archive-date=18 September 2015 |url-status=live |archive-url=https://web.archive.org/web/20150918215824/http://www.greatorme.org.uk/tramhistory.html |df=dmy-all }}</ref>
*On Sunday 30 April 2000, on the day of the Llandudno Transport Festival, 37 passengers were injured with 17 requiring hospital treatment following a head-on collision between trams 6 and 7 on the passing loop of the upper section. The cause of the accident, described as the most serious since the opening in 1902, was initially thought to be a points problem.<ref name="BBCNews20000430">{{cite news |title=Tram collision injures 17 passengers |url=http://news.bbc.co.uk/1/hi/wales/731597.stm |date=30 April 2000 |work=BBC News Online |publisher=BBC |access-date=15 September 2009}}</ref><ref name="NWRailNoticeboard">{{cite web |title=Accident on the Great Orme Tramway – report by John Murray |url=http://www.nwrail.org.uk/nw0005a.htm |date=1 May 2000 |work=North Wales Railway Noticeboard |publisher=Charlie Hulme |access-date=15 September 2009}}</ref> The investigation by [[His Majesty's Railway Inspectorate|Her Majesty’s Railway Inspectorate]] concluded that the two people responsible for surveying the position of the point did not notice the incorrect position because their training had been inadequate.
*Shortly after midday on 15 September 2009, two trams on the upper section collided at the passing loop above Halfway station. No serious injuries were reported, but both the [[Rail Accident Investigation Branch]] and the owners and operators, [[Conwy County Borough Council]], launched investigations. The RAIB published their report in 2010. The report concluded that the forces of wheels in the upper bogie of car 6 could move the point into the wrong position and this made the lower bogie run on the track of car 7. Wear of the rails and the point mechanism had allowed this result.<ref name="raib2010"/>
 
==Gallery==
A selection of views of the line, from lower station to summit:
 
<gallery mode=packed>
File:Great Orme Tramway Victoria station.jpg|Victoria station at the foot of the line
File:Great_Orme_Tramway.jpg|The line ascending Old Road, seen from Victoria Station
File:Great_Orme_Tramway_down_Old_Road.jpg|Looking down Old Road and over Llandudno Bay.
File:Great Orme Tramway, Llandudno (geograph 3451937).jpg|Tram descends across Ty Gwyn Road into Old Road
File:Great Orme Lower Section Turnout 20130714Y696.jpg|Detail of cable slot and pointwork at the lower section passing loop
File:Halfway Tram Station on the Great Orme - geograph.org.uk - 159297.jpg|Halfway station seen from above
File:Six and Seven , Great Orme tramway , Llandudno.jpg|Cars passing at the upper section passing loop
File:GreatOrme1-P4271287T.JPG|Tram No. 6 nearing the summit of the Great Orme
File:Great Orme Tramway top station - geograph.org.uk - 559561.jpg|The upper station
 
</gallery>
 
==See also==
* [[List of funicular railways]]
* [[Llandudno Cable Car]]
 
==References==
;Inline citations
{{Reflist|30em}}
;Other references
{{Refbegin}}
#[[J. I. C. Boyd]]; ''Narrow Gauge Railways in North Caernarvonshire Volume 3 Part 7 The Great Orme Tramway and Tramroad'' The Oakwood Press, 1986
#R.C. Anderson, A.M.Inst.T.; ''The Great Orme Railway'' Light Railway Transport League (later edition called ''The Great Orme Tramway'').
{{Refend}}
 
==External links==
{{Commons category|Great Orme Tramway}}
* [http://www.greatormetramway.co.uk/ Official Site]
* [http://www.greatorme.org.uk/tramway.html Information about the Tramway]
* [http://www.greatorme.org.uk/tramhistory.html Great Orme Tramway History]
* [http://www.tramwaybadgesandbuttons.com/page148/page149/styled-153/page576.html Great Orme Tramway at the British Tramway Company Badges and Buttons website.]
 
{{UK Light rail}}
{{Historic UK Trams}}
{{Authority control}}
 
[[Category:Great Orme Tramway| ]]
[[Category:Funicular railways in Wales]]
[[Category:Tram transport in Wales]]
[[Category:Llandudno]]