Full operating capability: Difference between revisions

Content deleted Content added
m +{{Mil-stub}} using StubSorter
 
(4 intermediate revisions by 4 users not shown)
Line 1:
{{Short description|Military logistics term}}
<!-- Please do not remove or change this AfD message until the discussion has been closed. -->
{{Article for deletion/dated|page=Full operating capability|timestamp=20200522232134|year=2020|month=May|day=22|substed=yes|help=off}}
<!-- Once discussion is closed, please place on talk page: {{Old AfD multi|page=Full operating capability|date=22 May 2020|result='''keep'''}} -->
<!-- End of AfD message, feel free to edit beyond this point -->
In military acquisition, '''full operating capability''' or '''full operational capability''' (FOC) is the completion of a development effort. This is usually preceded by an [[initial operating capability]] or initial operational capability (IOC) phase.
 
Line 25 ⟶ 22:
[[Category:Procurement]]
[[Category:Military terminology of the United States]]
 
 
{{Mil-stub}}