Content deleted Content added
ce, cap, alpha, layout, punct. |
added Category:Automated planning and scheduling using HotCat |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 7:
* A [[finite set]] of resources that can be used to complete each job
* A set of constraints that must be satisfied
** Temporal
** Procedural
** Resource
* A set of objectives to evaluate the scheduling performance
A typical factory floor setting is a good example of this, where it is necessary to schedule which jobs need to be completed on which machines, by which employees, in what order and at what time.
==Use of algorithms in scheduling==
Line 40:
| last1 = Lim | first1 = C.
| last2 = Sim | first2 = E.
| title = Production Planning in Manufacturing/Remanufacturing Environment using Genetic Algorithm
| url = https://www.koreascience.or.kr/article/CFKO200536035727674.pdf}}
Line 50 ⟶ 51:
[[Category:Genetic algorithms]]
[[Category:Mathematical optimization in business]]
[[Category:Automated planning and scheduling]]
|