Content deleted Content added
m Disambiguating links to EDF (link changed to Électricité de France) using DisamAssist. |
Rescuing 1 sources and tagging 0 as dead.) #IABot (v2.0.8.6) (BrownHairedGirl - 9440 |
||
Line 179:
In this case the DNO may act as BNO and its responsibility may include the sub-mains to the individual flats, or DNO responsibility may end at the first incomer, in which case the independent BNO is responsible for the secure distribution cabling 'laterals' between that point and the individual fuses and meters.
This arrangement is a relatively new development, historically such cabling would have been maintained and sealed by electricity boards that preceded the DNOs, and different DNOs supplying buildings of different sizes and conditions, may choose to adopt the wiring in the building or to insist that an independent BNO is appointed.<ref>{{Cite web |url=http://library.ukpowernetworks.co.uk/library/en/g81/Design_and_Planning/Planning_and_Design/Documents/EDS+08-0118+Multi-Occupied+Building+Supplies.pdf
and this allows those responsible for the building network (such as a housing association) to employ any suitable electrical contractor on an ad-hoc basis.
|