Content deleted Content added
→Minutes-after control: +anchor |
m →Seconds-after control: style |
||
Line 61:
* [[ancillary services]] are engaged (load is reduced as procured via reliability services contracts).
Another term commonly used for the primary control is '''frequency response''' (or "beta"). Frequency response also includes the [[inertial response]] of the generators.{{sfn|NERC|2021|p=12}} This is the parameter that is approximated by the frequency bias coefficient of the [[area control error]] (ACE)
=== Minutes-after control ===
|