Line 19:
== Hours-ahead operation ==
{{main|Merit order}}
In the hours prior to the delivery, a system operator might need to deploy additional [[supplemental reserve]]s or even commit more generation units, primarily to ensure the reliability of the supply while still trying to minimize the costs. At the same time, operator must ensure that enough [[reactive power reservereserves]]s are available to prevent the [[voltage collapse]].{{sfn|Conejo|Baringo|2017|p=10}}
 
=== Dispatch curve ===