Line 53:
== Control after disturbance ==
{{main|Frequency control|Voltage control and reactive power management}}
Small mismatches between the total demand and total load are typical and initially are taken care of by the [[kinetic energy]] of the rotating machinery (mostly [[synchronous generator]]s): when there is too much supply, the devices absorb the excess, and frequency goes above the scheduled rate, conversely, too much demand causes the generator to deliver extra electricity through slowing down, with frequency slightly decreasing,{{sfn|NERC|2021|p=1}} not requiring an intervention
=== Seconds-after control ===
|