Content deleted Content added
m Removed unnecessary nowiki from URL to improve accessibility, also moved persistent IDs to proper template. (via WP:JWB) |
Citation bot (talk | contribs) Alter: title, template type. Add: chapter. Removed parameters. | Use this bot. Report bugs. | Suggested by Headbomb | Linked from Wikipedia:WikiProject_Academic_Journals/Journals_cited_by_Wikipedia/Sandbox2 | #UCB_webform_linked 1438/2384 |
||
Line 11:
==Load flow calculation==
The load-flow calculation<ref>{{Cite
Using network topology, transmission line parameters, transformer parameters, generator ___location and limits, and load ___location and compensation, the load-flow calculation can provide voltage magnitudes and angles for all nodes and loading of network components, such as cables and transformers. With this information, compliance to operating limitations such as those stipulated by voltage ranges and maximum loads, can be examined. This is, for example, important for determining the transmission capacity of underground cables, where the influence of cable bundling on the load capability of each cable has to be taken also into account.
Line 19:
When changing over from single and/or multi-phase infeed low-voltage meshed networks to isolated networks, load-flow calculation is essential for operational and economical reasons. Load-flow calculation is also the basis of all further network studies, such as motor start-up or investigation of scheduled or unscheduled outages of equipment within the outage simulation.
Especially when investigating motor start-up,<ref>{{Cite
==Short circuit analysis==
|