Development of tidal stream generators: Difference between revisions

Content deleted Content added
added to new tidal power in Wales category
Added brief details of TEL
Line 117:
 
In October 2022, the company split out it's anchoring solutions as '''Swift Anchors''', with the aim to focus on different technologies including [[Floating wind turbine|Floating offshore wind]].<ref>{{Cite web |date=2022-10-19 |title=Sustainable Marine sells Swift Anchors to SCHOTTEL |url=https://www.offshore-mag.com/business-briefs/company-news/article/14284424/sustainable-marine-sells-swift-anchors-to-schottel |access-date=2023-12-22 |website=Offshore}}</ref>
 
=== Tidal Energy Ltd ===
[[File:©Tidal Energy Ltd..jpeg|alt=A workboat with a large crane is lowering a tidal turbine mounted on a triangular steel frame into the sea.|thumb|Tidal Energy Ltd - DeltaStream device installation in Ramsey Sound, Pembrokeshire in 2015]]
'''Tidal Energy Ltd''' (TEL) was a tidal stream developer based in Cardiff, Wales. They developed a three-bladed horizontal-axis turbine mounted on a 16&nbsp;m long triangular gravity base. To increase reliability, a simple fixed-pitch blade design was used.<ref>{{Cite conference |last=Freeman |first=C |last2=Amaral Teixeira |first2=J |last3=Trarieux |first3=F |last4=Ayre |first4=R |date=2009 |title=Design of a gravity stabilised fixed pitch tidal turbine of 400 kW |url=https://tethys-engineering.pnnl.gov/sites/default/files/publications/Freemanetal2009.pdf |conference=Proceedings of the 8th European Wave and Tidal Energy Conference, Uppsala, Sweden. |via=Tethys}}</ref>
 
A 400&nbsp;kW prototype was installed in [[Ramsey Island#Ramsey Sound|Ramsey Sound]], Wales in December 2015 after sitting on the quayside at [[Pembroke Dock]] for over a year.<ref name=":23">{{Cite web |last=Kelsey |first=Chris |date=2015-12-14 |title=Tidal energy device DeltaStream installed in the sea |url=http://www.walesonline.co.uk/business/business-news/radical-new-tidal-energy-device-10594709 |access-date=2024-02-03 |website=Wales Online |language=en}}</ref><ref name=":36">{{Cite news |date=2015-12-13 |title=Giant tidal turbine placed on seabed off Pembrokeshire |url=https://www.bbc.com/news/uk-wales-south-west-wales-35087510 |access-date=2024-02-03 |work=BBC News |language=en-GB}}</ref> In March 2016, the turbine developed "an intermittent fault with an active sonar" followed by a mechanical defect which prevented it generating.<ref name=":37">{{Cite web |last=Poindexter |first=Gregory |date=2016-12-13 |title=Welsh government says buyer being sought for 400-kW DeltaStream tidal energy device |url=https://www.hydroreview.com/business-finance/business/welsh-government-says-buyer-being-sought-for-400-kw-deltastream-tidal-energy-device/ |access-date=2024-02-03 |website=Hydro Review |language=en-US}}</ref> After the company went into administration, the Welsh Government sought a buyer for the turbine in December 2016.<ref name=":37" />
 
The triangular base frame was designed to support three turbines, although only a single turbine was tested.<ref name=":36" /> Eco2 in conjunction with TEL had planned to install an array of nine devices [[St David's Head]], to the north of Ramsey Sound.<ref name=":23" />
 
=== Tocardo ===