Line 37:
** '''Package-I: Paletwa inland jetty to Kaletwa road route in Myanmar - {{convert|67|km|abbr=on}}''' is '''Complete''' as per March 2024 update.<ref name=jooats1/><ref name=jooats3/>
** '''Package-II: Kaletwa to Zorinpui road route in Myanmar - {{convert|48.5|km|abbr=on}}''' is '''under construction''' as per March 2024 update, militants in control of the area have assured cooperation and security for the completion of the road.<ref name=jooats2/><ref name=jooats3>[https://idsa.in/idsacomments/The-Kaladan-Transport-Project-Amidst-the-Civil-War-in-Myanmar-OPDas-220724
* '''Zorinpui to Aizawl road route in India - {{convert|110|km|abbr=on}}''' from Indo-Myanmar border at Zorinpui to Aizawl. From Aizawl it connect to Aizawl-Saiha National Highway at [[Lawngtlai]] in [[Mizoram]], India by road on [[National Highway 54 (India)]] (NH-54), which then continues further to [[Dabaka]] in [[Assam]] via {{convert|850|km|abbr=on}} long NH-54 which in turn is part of the larger [[North–South and East–West Corridor#East-West Corridor|East–West Corridor]] connecting [[North East India]] with the rest of India.<ref>{{Cite web |url=http://www.arakanrivers.net/wp-content/uploads/2009/09/Kaladan-Mov.png |title=Multi-modal route map |access-date=12 November 2014 |archive-url=https://web.archive.org/web/20170822053547/http://www.arakanrivers.net/wp-content/uploads/2009/09/Kaladan-Mov.png |archive-date=22 August 2017 |url-status=dead }}</ref><ref name=biz1>[http://www.thehindubusinessline.com/news/national/india-awards-road-contract-to-complete-kaladan-project-in-myanmar/article9723297.ece India awards road contract to complete Kaladan project in Myanmar], ''Business Line'', 9 June 2017.</ref> '''Complete''' as per March 2024 update.<ref name=jooats3/><ref name=jooats1>[https://theprint.in/india/mizoram-mp-meets-myanmar-militants-in-push-to-speed-up-work-on-key-connectivity-project/1985471/ Mizoram MP meets Myanmar militants in push to speed up work on key connectivity project], The Print, 1 Mar 2024.</ref><br> '''Note:''' The {{convert|90|km|abbr=on}} 2-lane route from Indo-Myanmar border at Zochawchhuah-Zorinpui to [[Tuipang]] is complete. From Tuipang, the national highway wass further upgraded from 2-lane to all-weather 4-lane from [[National Highway 54 (India)|NH 54]] [[Lawngtlai]] to [[Aizawl]] in [[Mizoram]].<ref name=biz1/> INR6000 crore (60 billion) was approved to further improve this Zochawchhuah–Zorinpui–Aizawl national highway.<ref name=mand2/> Lomasu to [[Lawngtlai]] is a two-lane highway in each direction (total four lanes) and Lawngtlai to [[Aizawl]]–[[Guwahati]] national highway was widened to 4 lanes in each direction (total 8 lanes).<ref name=high1>[https://www.irrawaddy.com/news/myanmar-india-appoint-operator-sittwe-port-project.html India appoints post operator], ''Irrawaddy''</ref>
|