Building information modeling: Difference between revisions

Content deleted Content added
Tag: Reverted
m Reverted edit by 182.65.17.7 (talk) to last version by Bruce1ee
Line 65:
Building information models span the whole concept-to-occupation time-span. To ensure efficient management of information processes throughout this span, a BIM manager might be appointed. The BIM manager is retained by a design build team on the client's behalf from the pre-design phase onwards to develop and to track the object-oriented BIM against predicted and measured performance objectives, supporting multi-disciplinary building information models that drive analysis, schedules, take-off and logistics.<ref>[http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelPage=/ep/channel/gsaOverview.jsp&channelId=-24291] {{webarchive|url=https://web.archive.org/web/20091112145341/http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelPage=%2Fep%2Fchannel%2FgsaOverview.jsp&channelId=-24291|date=12 November 2009}}</ref><ref>{{cite web|url=http://www.senaatti.fi/document.asp?siteID=2&docID=588|title=Senate Properties modeling guidelines|publisher=Gsa.gov|access-date=17 October 2014|url-status=dead|archive-url=https://web.archive.org/web/20120226194436/http://www.senaatti.fi/document.asp?siteID=2&docID=588|archive-date=26 February 2012}}</ref> Companies are also now considering developing BIMs in various levels of detail, since depending on the application of BIM, more or less detail is needed, and there is varying modeling effort associated with generating building information models at different levels of detail.<ref>{{cite journal |doi=10.1016/j.autcon.2010.11.027 |title=Analysis of modeling effort and impact of different levels of detail in building information models |year=2011 |last1=Leite |first1=Fernanda |last2=Akcamete |first2=Asli |last3=Akinci |first3=Burcu |last4=Atasoy |first4=Guzide |last5=Kiziltas |first5=Semiha |journal=[[Automation in Construction]] |volume=20 |issue=5 |pages=601–9}}</ref>
 
===BIM in construction management===
===BIM THE BUILDING INFORMATION MODELING ABOUT THE CONSTRUCTION
Participants in the building process are constantly challenged to deliver successful projects despite tight budgets, limited staffing, accelerated schedules, and limited or conflicting information. The significant disciplines such as [[Architectural engineering|architectural]], [[Structural engineering|structural]] and [[mechanical, electrical, and plumbing|MEP]] designs should be well-coordinated, as two things can't take place at the same place and time. BIM additionally is able to aid in collision detection, identifying the exact ___location of discrepancies.