The '''Kaladan Road Project'''<ref name=":0">{{cite news|last=Purushothaman|first=Vakkom|url=http://tntmagazine.in/news/mizoram/kaladan-multi-modal-transit-transport-project-to-link-sea-route-in-myanmar-with-mizoram/|title=Kaladan Multi Modal Transit Transport Project to link sea route in Myanmar with Mizoram|newspaper=The Northeast Times|access-date=11 August 2012|url-status=dead|archive-url=https://web.archive.org/web/20120415053036/http://tntmagazine.in/news/mizoram/kaladan-multi-modal-transit-transport-project-to-link-sea-route-in-myanmar-with-mizoram/|archive-date=15 April 2012}}</ref> ({{langx|my|ကုလားတန်မြစ်ကြောင်း ဘက်စုံဖွံ့ဖြိုးရေး စီမံကိန်း}}) is a US$484 million project connecting the eastern Indian seaport of [[Kolkata]] with [[Sittwe]] seaport in [[Rakhine State]], Myanmar by sea. In Myanmar, it will then link Sittwe seaport to [[Paletwa]] in [[Chin State]] via the [[Kaladan river]] boat route, and then from Paletwa by road to [[Mizoram]] state in Northeast India. All components of the project, including Sittwe port and power, river [[dredging]], and Paletwa jetty, have been completed,<ref name=update2>[https://www.thestatesman.com/supplements/north/still-under-construction-1502635461.html Still under construction], ''The Statesman'', 13 May 2018.</ref><ref name=update3>[https://www.thehindubusinessline.com/news/india-starts-construction-of-1600-cr-mizoram-myanmar-kaladan-road/article23577107.ece India starts construction of ₹1,600-cr Mizoram-Myanmar Kaladan road], ''Business Line'', 17 April 2018.</ref> except the under construction Zorinpui-Paletwa road.<ref name=jats1>[https://theprint.in/diplomacy/110-km-road-is-final-challenge-for-long-delayed-india-myanmar-kaladan-connectivity-project/629247/ 110-km road is final challenge for long-delayed India-Myanmar Kaladan connectivity project], The Print, 29 March, 2021.</ref> Originally, the project was scheduled to be completed by 2014, but end-to-end project is expected to be fully operational only by December 2023 as per November 2023 update.<ref name=jats1/>
Paletwa is less than {{convert|20|km|abbr=on}} from the Bangladesh border.
Line 9:
==History==
This project will reduce the distance from [[Kolkata]] to [[Sittwe]] by approximately {{convert|1328|km|abbr=on}} and will reduce the need to transport goods through the narrow [[Siliguri]] corridor, also known as [[Chicken's Neck (India)|Chicken's Neck]].
Initially India had tried to persuade [[Bangladesh]] to offer transport and transit rights to the northeastern states.<ref>{{Cite journal |last=Egreteau |first=Renaud |date=2011 |title=A Passage to Burma? India, Development and Democratization in Myanmar |url=https://www.tandfonline.com/doi/abs/10.1080/13569775.2011.619771|journal=Contemporary Politics|volume=17|issue=4|doi=10.1080/13569775.2011.619771 |pages=467–486 |s2cid=153496597}}</ref> However, [[Bangladesh]] has consistently refused to grant such rights, including access to its [[Chittagong]] port, which is less than {{convert|200|km|abbr=on}} away from [[Agartala]], the capital of [[Tripura]].<ref>{{cite news|last=Phukan|first=Papori|title=Kaladan Multi-Modal Project In Myanmar|url=http://manipuronline.com/look-east-policy/kaladan-multi-modal-project-in-myanmar/2010/12/19|access-date=11 August 2012|newspaper=Manipur Online}}</ref>
|