Content deleted Content added
Undid revision 1298427098 by 180.252.168.103 (talk) split |
|||
Line 549:
*[[Cisumdawu Toll Road]] (60.5 km)
*[[Cipularang Toll Road]] (58.5 km)
*[[
*[[Jagorawi Toll Road]] (46 km)
*[[Palimanan–Kanci Toll Road]] (28.8 km)
Line 557:
*[[Soreang–Pasir Koja Toll Road]] (10.6 km)
*[[Bocimi Toll Road]] (built: Bogor-Cigombong) (15.3 km)
In addition to completed highways there are some highways that are being built
Several other proposed toll roads are Bandung Intra-Urban Toll Road, Cileunyi–Tasikmalaya, and Jakarta Outer Ring Road 2 (a section of this road has been built).
|