West Java: Difference between revisions

Content deleted Content added
Undid revision 1298427098 by 180.252.168.103 (talk) split
Line 549:
*[[Cisumdawu Toll Road]] (60.5 km)
*[[Cipularang Toll Road]] (58.5 km)
*[[PadaleunyiPadalarang–Cileunyi Toll Road]] (33 km)
*[[Jagorawi Toll Road]] (46 km)
*[[Palimanan–Kanci Toll Road]] (28.8 km)
Line 557:
*[[Soreang–Pasir Koja Toll Road]] (10.6 km)
*[[Bocimi Toll Road]] (built: Bogor-Cigombong) (15.3 km)
In addition to completed highways there are some highways that are being built, one of them is [[Cisumdawu Toll Road|Cileunyi–Sumedang–Dawuan]] (Cisumdawu) with length 60.1 kilometers.
 
Several other proposed toll roads are Bandung Intra-Urban Toll Road, Cileunyi–Tasikmalaya, and Jakarta Outer Ring Road 2 (a section of this road has been built).