ForPer thisquesta productionproduzione, avenne specialallestita anduna spectacularspeciale stagee productionspettacolare was setscenografia, coveringcoprendo thela usualconsueta decorationdecorazione at thedel club ande, apparentlyapparentemente, theil stagepalco ande il backstage were completely rebuilt andvennero thecompletamente wallsristrutturati ande ceilingsle werepareti repaintedei insoffitti blackridipinti todi thenero horrorper ofl'orrore thedel club manager Jack Barrie.
The performance on Saturday the 19th of October lasted for 10 hours. All the songs were needed to be re-shot several times from different positions since the Marquee club was such as small place the it didn't allow to do takes from different angles at the same time.