Content deleted Content added
mNo edit summary |
m Date maintenance tags and general fixes |
||
Line 1:
{{Wikify|date=March 2009}}
{{Unreferenced|date=March 2009}}
'''Evidence-based Scheduling''' is a software estimation approach created by Joel Spolsky, a [http://www.amazon.com/Joel-Software-Occasionally-Developers-Designers/dp/1590593898/ commentator] on software engineering principles.
The previous page describing the approach was deleted on the grounds of it being blatant advertising (Spolsky's company sells a tool which includes it as a feature). It was recreated on the grounds that this technique is an important software engineering technique for the [http://stackoverflow.com/questions/8876/evidence-based-scheduling-tool community] and Spolsky's original blog posting <ref name="EBS">[http://www.joelonsoftware.com/items/2007/10/26.html], Evidence-based Scheduling blog posting 2007</ref> of the idea is sufficiently clear for anyone to implement it.
Line 20:
==References==
{{Reflist}}
[[Category:Software engineering]]
{{software-eng-stub}}
|