Content deleted Content added
No edit summary |
No edit summary |
||
Line 13:
: SD = (''b'' − ''a'')/6
''E'' is a [[weighted average]] which takes into account both the most optimistic and most pessimistic estimates provided and SD measures the variability or uncertainty in the estimate.
To produce a project estimate the project manager:
|