Content deleted Content added
→Semarang-Solo Toll Road: Section E1 |
m Typo fixing, replaced: aquisition → acquisition (2), typos fixed: buid → build, lenght → length (4) using AWB (7660) |
||
Line 14:
== [[Jakarta-Cikampek Toll Road]] ==
Has been fully operated by [[Jasa Marga]]. The west part of toll road near [[Jakarta]] consists of 4 lanes and 3 lanes for other direction. The most profitable toll road, although launched after [[Jagorawi Toll Road]] and Jakarta-Tangerang Toll Road above.
PT Lippo Cikarang Tbk will
== [[Cikampek-Palimanan toll road|Cikampek-Palimanan Toll Road]] ==
The 116 kilometers
More than 90 percent of land
== [[Palimanan-Kanci Toll Road]] ==
Line 30:
== [[Pemalang-Batang Toll Road]] ==
At as February 2011 land acquisition was only 3 percent from the total
== [[Batang-Semarang Toll Road]] ==
Line 47:
== [[Kertosono-Mojokerto Toll Road]] ==
== [[Mojokerto-Surabaya Toll Road]] ==
Length of the toll road is 36.1 kilometers and known also as Sumo (Surabaya-Mojokerto) toll road. Land acquisition as at February 2011 was 40 percent. Although all of land acquisitions not yet finished, the road construction has been commenced by [[Jasa Marga]]. Mei 2011: Until now process of acquisition of minority shareholders by Jasa Marga is still on going, but consequently for temporary land of
== [[Surabaya-Gempol Toll Road]] ==
Has been fully operated by [[Jasa Marga]], but only until [[Porong]], because of [[Sidoarjo mudflow|Lapindo Mudflow]]. So, there are a new Porong-Gempol Toll Road relocation with
== [[Gempol-Pasuruan Toll Road]] ==
|