Line 192:
If schedule constraints are an issue, it is possible to use schedule float. Also carefully analyze the schedule for tasks that can overlap, If they exist, look at defining the tasks with more granularity. Lastly, if the funds are available, add more resources to try to compress the schedule. All of these introduce their own risk.
 
Continually analyze the project for other risks. Kendrick provides a general list of risk categories to assist in [[Brainstorming|brainstorm]]ing, analyzing historical data or previous projects.
 
===Quantifying and Analyzing Activity Risk===