Content deleted Content added
Line 16:
{{Underlinked|date=March 2014}}
JTIDS began with an advanced planning study sponsored by the Air Force Electronic Systems Division (ESD) Advanced Plans (XR) at L.G. [[Hanscom Field]]. The study was conducted by
The advanced planning study was well received both at MITRE and ESD and it was decided to pursue a practical design to see if these ideas could be translated into a usable system. In 1968 MITRE Technical Director John H. Monahan appointed C. Eric Ellingson to head this effort and Ellingson put together a technical team to pursue these ideas. Early on it became apparent that the CASOFF architecture was sufficiently radical that a "proof of concept" activity was needed to better understand and ultimately demonstrate the feasibility and benefits of such an approach. The demonstration system used a synchronized Time Division Multiple Access architecture and incorporated position ___location as an integral part of the communications process. Because funds were extremely limited every effort was made to use already available equipment. Transmitters were surplus AN/APX-25 IFF transponders and data processing was accomplished using surplus IBM 4piTC-2 computers that were obtained from the F-111 terrain avoidance program. The unique components called the Control and Display Units (CDU) were built in the MITRE laboratory.
|