==Harold Kerzner chapter on PERT==
Embarassing typo in the 10th edition, p. 502: "Since there exists only one path through the network that is the longest, the other paths must be either equal in length to or shorter than that path." <small class="autosigned">— Preceding [[Wikipedia:Signatures|unsigned]] comment added by [[Special:Contributions/129.199.97.130|129.199.97.130]] ([[User talk:129.199.97.130|talk]]) 08:49, 19 March 2015 (UTC)</small><!-- Template:Unsigned IP --> <!--Autosigned by SineBot-->
==Implementation Error==
The last diagram in the Implementation system fails, as it does not list the slack/float times to the left and right of the task names as is common practice in the project management community. Without this information, it is difficult to determine the critical path. With this information, the critical path(s) (yes, there can be more than one) are those blocks (activities) where the slack/float time is zero. [[Special:Contributions/75.70.164.249|75.70.164.249]] ([[User talk:75.70.164.249|talk]]) 06:39, 6 November 2015 (UTC)
|