Cost estimation in software engineering: Difference between revisions

Content deleted Content added
m Both the links link doesn't have provide any extra information on cost estimation in software engineering and there are no such popular methods in use having the same name.
2x dab tags removed (nothing to resolve)
Line 7:
*[[Analysis effort method]]
*[[GOT]]{{dn|date=October 2018}}, the first version known as GOT 81 and the second as GOT™ II
*Vikings{{dn|date=October 2018}}
*Stranger Things{{dn|date=October 2018}}
*[[Estimation theory|Parametric Estimating]]
*[[Extreme_Programming_Practices#Planning_game|The Planning Game]] (from [[Extreme Programming]])