Content deleted Content added
Reverted 1 edit by 50.225.237.6 (talk): Rv user comments in article (TW) |
Undid revision 894087685 by 223.186.99.44 (talk) earlier better |
||
Line 19:
4. Feasibility
The cost of the approach should be a measure of the cost of all tools and effort. The duration of development and testing affects the [[time-to-market]] for a planned product. Safety factor and development duration are typically equated to a cost measure. Specific conditions that warrant the use of HIL simulation include the following:
* Enhancing the quality of testing
* Tight development schedules
|