Content deleted Content added
m Task 18 (cosmetic): eval 6 templates: del empty params (5×); hyphenate params (3×); |
|||
Line 66:
Pretest probability = (True positive + False negative) / Total sample
Also, in this case, the ''positive post-test probability'' (the probability of having the target condition if the test falls out positive), is numerically equal to the [[positive predictive value]], and the ''negative post-test probability'' (the probability of
In the diagram above, this ''positive post-test probability'', that is, the posttest probability of a target condition given a positive test result, is calculated as:
|