V-model (software development): Difference between revisions

Content deleted Content added
Tag: Reverted
m Reverting possible vandalism by 111.118.251.130 to version by 86.201.25.239. Report False Positive? Thanks, ClueBot NG. (3849435) (Bot)
Line 49:
=== Integration testing ===
 
Integration Test Plans are developed during the Architectural Design Phase. These tests verify that units created and tested independently can coexist and communicate among themselves. Test results are shared with customer's team.support
 
=== System testing ===