Content deleted Content added
→History: Add authorship teams for CMMI-DEV 1.2 and 1.3, and for CMMI-SVC 1.3 |
m →Model (v2.0): link for difference |
||
Line 127:
In version 2.0 DEV, ACQ and SVC were merged into a single model where each process area potentially has a specific reference to one or more of these three aspects. Trying to keep up with the industry the model also has explicit reference to agile aspects in some process areas.
Some key differences between v1.3 and v2.0 models are given below; this is not an exhaustive list. Additional information is available [https://www.cmmiinstitute.com/getattachment/5e9800b1-3637-4da1-bda3-677b8f66e064/attachment.aspx here]
# "Process Areas" have been replaced with "Practice Areas (PA's)". The latter is arranged by levels, not "Specific Goals".
|