Content deleted Content added
No edit summary |
m linking |
||
Line 53:
=== System testing ===
System Tests Plans are developed during System Design Phase. Unlike Unit and Integration Test Plans, System Test Plans are composed by client's business team. System Test ensures that expectations from application developed are met. The whole application is tested for its functionality, interdependency and communication. System Testing verifies that functional and non-functional requirements have been met. Load and performance testing, stress testing, [[regression testing]], etc., are subsets of system testing.
=== User acceptance testing ===
|