General Code of Operating Rules: Difference between revisions

Content deleted Content added
tag with {{Bare URL PDF}}
Categories: updating chapter headings in accordance with the 8th Edition (2020).
Line 17:
The full set of GCOR rules is divided into 17 categories.
#General Responsibilities
#Railroad Radio and Communication Rules
#''Section Reserved''
#[[Standard time|Standard Time]] **Some railroads may amend this item into the System Special Instructions.
#[[Public transport timetables|Timetables]]
#[[Railway signal|Signals]] and Their Use
Line 25:
#[[Railroad switch|Switches]]
#[[Absolute Block|Block System Rules]]
#Rules Applicable onlyOnly in [[Centralized Traffic Control]] (CTC)
#Rules Applicable in ACS, ATC and ATS TerritoryTerritories
#Rules Applicable onlyOnly in [[Automatic train stop|Automatic Train Stop]] (ATS) Territory
#Rules Applicable onlyOnly in [[Cab signalling|Automatic Cab Signal]] System (ACS) Territory
#Rules Applicable onlyOnly withinWithin [[Track warrant|Track Warrant Control]] (TWC) Limits
#Track Bulletin Rules
#Rules Applicable onlyOnly in [[Direct traffic control|Direct Traffic Control]] (DTC) TerritoryLimits
#Rules Applicable Only in [[Automatic Train Control]] (ATC) Territory
#Rules Applicable Only in [[Positive Train Control]] (PTC) Territory
#''Section Reserved''
 
==See also==