Content deleted Content added
→Day-ahead operation: Expanding article |
→Hours-ahead operation: +OPF |
||
Line 11:
{{main|Economic dispatch}}
In the hours prior to the delivery, a system operator might need to deploy additional [[supplemental reserve]]s or even commit more generation units, primarily to ensure the reliability of the supply while still trying to minimize the costs. At the same time, operator must ensure that enough [[reactive power reserve]]s are available to prevent the [[voltage collapse]].{{sfn|Conejo|Baringo|2017|p=10}}
== Minutes-ahead operation ==
In the minutes prior to the delivery, a system operator is using the [[power-flow study]] algorithms in order to find the [[optimal power flow]].{{sfn|Conejo|Baringo|2017|p=10}}
== References ==
|