Line 6:
Day-ahead operation schedules the generation units that can be called upon to provide the electricity on the next day ('''unit commitment'''). The [[dispatchable generation]] units can produce electricity on demand and thus can be scheduled with accuracy. The production of the weather-dependent [[variable renewable energy]] for the next day is not certain, its sources are thus non-dispatchable. This variability, coupled with uncertain future power demand and the need to accommodate possible generation and [[electricity transmission|transmission]] failures requires scheduling of [[operating reserve]]s that are not expected to produce electricity, but can be dispatched on a very short notice.{{sfn|Conejo|Baringo|2017|p=9}}
Some units have unique features that require their commitment much earlier: for example, the [[
For a "traditional" [[vertical integration#Electric utilities|vertically integrated electric utility]] the main goal of the unit commitment is to minimize both the [[marginal cost]] of producing the unit electricity and the (quite significant for fossil fuel generation) start-up costs. In a "restructured" [[electricity market]] a [[market clearing]] algorithm is utilized, frequently in a form of an [[auction]]; the [[merit order]] is sometimes defined not just by the monetary costs, but also by the environmental concerns.{{sfn|Conejo|Baringo|2017|p=9}}
|