Content deleted Content added
→Hours-ahead operation: clarification |
m →Minutes-ahead operation: style |
||
Line 28:
== Minutes-ahead operation ==
In the minutes prior to the delivery, a system operator is using the [[power-flow study]] algorithms in order to find the [[optimal power flow]]. At this stage the goal is reliability ("security") of the supply.{{sfn|Conejo|Baringo|2017|p=10}} The practical electric networks are too complex to perform the calculations by hand, so from 1920s the
== References ==
|