Content deleted Content added
→Hours-ahead operation: style |
|||
Line 25:
| right
}}
The decisions ("[[economic dispatch]]") are based on the '''dispatch curve''', where the X-axis constitutes the system power, intervals for the generation units are placed on this axis in the ''[[merit order]]'' with the interval length corresponding to the maximum power of the unit, Y-axis values represent the marginal cost
* A can deliver up to 120 MW at the cost of $30 per MWh (from 0 to 120 MW of system power);
* B can deliver up to 80 MW at $60/MWh (from 120 to 200 MW of system power);
|