Content deleted Content added
m →Overview: capitalization |
unnecessary See also section Tag: Reverted |
||
Line 22:
After the [[Naperville train disaster]] caused by a missed signal, the ICC required additional technical safety systems for any train traveling at or above 80 mph with the rule taking effect in 1951. Those railroads still interested in high speed operations IIATS met the minimum ICC requirements with a lower cost compared to [[Pulse code cab signaling|other cab signaling]] or automatic train control systems, however with rail travel facing increased competition from cars and airplanes most railroads simply choose to accept the new speed limit. Only the [[Atchison, Topeka and Santa Fe]] choose to fully equip its Chicago to Los Angeles and Los Angeles to San Diego main lines in support of the [[Super Chief]] and other premier high speed trains.
IIATS installations reached their peak in 1954 with a total of 8650 road miles, 14400 track miles, and 3850 locomotives equipped with the system. However, with the collapse of long distance passenger rail travel and the general North American railroad industry malaise in 1971, the bankrupt [[Penn Central]] was permitted to remove IIATS from its Water Level Route along with the Southern and other railroads with test or pilot IIATS systems.
When the [[New Jersey Transit]] [[RiverLINE]] opened in 2004 it featured a new IIATS system. This is a light rail systems running on shared track with main line freight traffic and IIATS is used to enforce a full stop at equipped signals instead of as a warning system.
==References ==
|