Content deleted Content added
Novemberjazz (talk | contribs) copyedits and book source |
Citation bot (talk | contribs) Alter: title, url. URLs might have been anonymized. Add: volume, series, s2cid, authors 1-1. Removed parameters. Some additions/deletions were parameter name changes. | Use this bot. Report bugs. | Suggested by AManWithNoPlan | #UCB_CommandLine |
||
Line 1:
An '''engineering verification test''' ('''EVT''') is performed on first [[engineering]] [[prototype]]s, to ensure that the basic unit performs to [[design]] goals and [[specifications]].<ref>{{Cite journal |date=2002-08-01 |title=Product news |url=https://doi.org/10.1007/BF02715446 |journal=Practical Failure Analysis |language=en |volume=2 |issue=4 |pages=23–25 |doi=10.1007/BF02715446 |s2cid=195269651 |issn=1864-1245}}</ref> Verification ensures that designs meets requirements and specification while validation ensures that created entity meets the user needs and objectives.<ref>{{Cite journal |
==Tests==
Line 12:
==Importance==
Identifying design problems and solving them as early in the design cycle as possible is a key to keeping projects on time and within budget. Too often, [[product design]] and performance problems are not detected until late in the [[product development]] cycle, when the product is ready to be shipped.<ref>{{Cite book |
==Prototyping==
|