Content deleted Content added
Fgnievinski (talk | contribs) |
Citation bot (talk | contribs) Misc citation tidying. | Use this bot. Report bugs. | Suggested by AManWithNoPlan | #UCB_CommandLine |
||
Line 21:
{{see also|Triangulation (surveying)}}
In surveying work,<ref>Glossary of the Mapping Sciences, American Society of Civil Engineers, page 451. [https://books.google.com/books?id=jPVxSDzVRP0C&
For the type of precision work involved in surveying, the unmapped point is located by measuring the angles subtended by lines of sight from it to a minimum of three mapped (coordinated) points. In [[geodesy|geodetic]] operations the observations are adjusted for [[spherical excess]] and [[projection variation]]s. Precise angular measurements between lines from the point under ___location using [[theodolite]]s provides more accurate results, with trig beacons erected on high points and hills to enable quick and unambiguous sights to known points.
|