Content deleted Content added
→Sources: +1 |
m →Seconds-after control: Adding/removing wikilink(s) |
||
Line 61:
* [[ancillary services]] are engaged (load is reduced as procured via reliability services contracts).
Another term commonly used for the primary control is '''frequency response''' (or "beta"). Frequency response also includes the [[inertial response]] of the generators.{{sfn|NERC|2021|p=12}} This is the parameter that is approximated by the [[Frequency bias (electrical grid)|frequency bias]] coefficient of the [[area control error]] (ACE) calculation used for [[automatic generation control]].{{sfn|NERC|2021|p=14}}
=== Minutes-after control ===
|