In 2019, Minesto tested a 500 kW '''Deep Green DG500''' turbine in the Holyhead Deep, a channel off the coast of Holyhead.<ref>{{Cite web |date=15 August 2019 |title=Minesto flies Wales tidal kite |url=https://renews.biz/54809/minesto-flies-wales-tidal-kite/ |access-date=2024-01-01 |website=ReNEWS.biz}}</ref> The turbine was connected to a buoy which analysed the power produced, but it was not connected to the GB Grid.<ref>{{Cite web |last=Harris |first=Michael |date=2018-06-05 |title=Minesto's Holyhead Deep tidal generating site ready to begin production |url=https://www.hydroreview.com/world-regions/europe/minesto-s-holyhead-deep-tidal-generating-site-ready-to-begin-production/ |access-date=2024-01-01 |website=Hydro Review |language=en-US}}</ref> The Holyhead Deep is within the West Anglesey Demonstration Zone, now part of the [[Morlais]] project.
Two 100 kW '''Dragon 4''' turbines were installed at [[Vestmanna|Vestmannasund]] in the Faroe Islands in 2022, supplying electricity to the local grid via [[SEV (company)|SEV]].<ref>{{Cite web |last=Garanovic |first=Amir |date=2022-09-07 |title=Minesto starts commissioning second ‘Dragon 4’ tidal power plant |url=https://www.offshore-energy.biz/minesto-starts-commissioning-second-dragon-4-tidal-power-plant/ |access-date=2024-01-01 |website=Offshore Energy |language=en-US}}</ref> These have a 5 m wingspan and are tethered to the seabed by a 40 m long cable.<ref>{{Cite news |date=2021-11-29 |title=The underwater 'kites' generating electricity as they move |language=en-GB |work=BBC News |url=https://www.bbc.com/news/business-59401199 |access-date=2024-01-02}}</ref>
In November 2023, Minesto shipped a '''1.2 MW Dragon 12''' turbine manufactured and tested in Sweden to the Faroes.<ref>{{Cite web |last=Garanovic |first=Amir |date=2023-11-09 |title=Minesto’s 1.2MW tidal energy device on its way to Faroe Islands |url=https://www.offshore-energy.biz/minestos-1-2mw-tidal-device-on-its-way-to-faroe-islands/ |access-date=2024-01-01 |website=Offshore Energy |language=en-US}}</ref> The company have plans to build four arrays of 20–40 MW, totaling 120 MW in the Faroe Islands, reportedly supplying 40% of the islands electricity demand.<ref>{{Cite web |last=Garanovic |first=Amir |date=2022-04-13 |title=Minesto outlines tidal array build-out plan to bolster energy transition of the Faroe Islands |url=https://www.offshore-energy.biz/minesto-outlines-tidal-array-build-out-plan-to-bolster-energy-transition-of-the-faroe-islands/ |access-date=2024-01-01 |website=Offshore Energy |language=en-US}}</ref> === Nova Innovation ===
|