Personal software process: Difference between revisions

Content deleted Content added
top: needs more in-line references
No edit summary
Line 22:
;PSP0, PSP0.1 (Introduces process discipline and measurement)
PSP0 has 3 phases: planning, development (design, code, compile, test) and a post mortem.
A baseline is established offor current process measuring: time spent on programming, faults injected/removed, and size of a program.
In a post mortem, the engineer ensures all data for the projects has been properly recorded and analysed.
PSP0.1 advances the process by adding a coding standard, a size measurement and the development of a personal process improvement plan (PIP). In the PIP, the engineer records ideas for improving his own process.