{{quote box|width=30.0em|align=right|quote=Modernizing Caltrain is a priority because we need an improved rail system that will help reduce our greenhouse gas emissions and serve our growing ridership. Not only will the electrification project reduce diesel emissions in this corridor by 96 percent by 2040, but it will also allow Caltrain to provide additional service to more stations, increasing ridership and providing faster service in Silicon Valley from San Francisco to San Jose.|author= —Jim Hartnett, Caltrain Executive Director<ref>{{cite web|url=http://www.masstransitmag.com/article/12186524/caltrain-modernization-program-to-electrify-bay-areas-silicon-valley-rail-corridor|title=Modernization: Electrifying the Bay Area's Silicon Valley Rail Corridor|publisher=Mass Transit Magazine|date=21 April 2016|author=Tasha Bartholomew|access-date=29 March 2017}}</ref>}}
The Peninsula Corridor Electrification Project (PCEP)
The second part of the CalMod project is a positive train control system, "CBOSS" (Communications Based Overlay Signal System), which is designed to meet federal safety requirements and as a condition set by the FRA to allow mixed traffic on the corridor. Key decisions in the development of CalMod can be traced back to the 1992 ''Feasibility Study'', which recommended 25 kV AC [[overhead line]]s;<ref name="Morrison Knudsen Corp. 1992 8"/> the 1998 ''Rapid Rail Study'', which recommended low-cost upgrades to first improve service and build demand;<ref name="Caltrain 1998 16"/> the 2006 ''Caltrain 2025'' proposal, which proposed the use of lightweight electric multiple units;<ref name=Project2025>{{cite report |url=http://www.caltrain.org/pdf/project2025/Project2025_REPORT_113006.pdf |title=Project 2025 |date=November 30, 2006 |publisher=Peninsula Corridor Joint Powers Board |access-date=March 29, 2017 |archive-url=https://web.archive.org/web/20071026221620/http://www.caltrain.org/pdf/project2025/Project2025_REPORT_113006.pdf |archive-date=October 26, 2007 |url-status=dead|pages=20–21}}</ref> the 2009 FRA waiver, which imposed certain conditions on mixed traffic;<ref>{{harvnb|Peninsula Corridor Joint Powers Board|2009|p=8}}</ref> and the 2012 memorandum of understanding with CHSRA, which resulted in a "blended" system to use the existing twin-track line as much as possible.<ref>{{harvnb|Caltrain|2012|pp=5–6}}</ref> The 2012 ''Blended Operations'' report concluded a new {{convert|8|mi|adj=on}} quad-track overtake section would allow Caltrain and CHSRA to coexist on the Peninsula Corridor with up to ten trains per peak hour: six Caltrain and four high-speed rail trains.<ref>{{harvnb|LTK Engineering|2012|pp=34–38}}</ref> Peak load on the system assuming twelve eight-EMU consists in each direction per hour was estimated to be approximately 75 MW, with the load generally remaining under 40-50 MW at any point.<ref>{{cite magazine |doi=10.1109/MVT.2009.932544 |author=Kneschke, Tristan A. |date=June 2009 |magazine=IEEE Vehicular Technology Magazine |volume=4 |issue=2 |issn=1556-6072 |pages=44–52 |title=Caltrain electrification}} [https://www.researchgate.net/publication/224468863_Caltrain_electrification alternate ResearchGate link with PDF]</ref>
|