Module:Adjacent stations/OC Transpo: Difference between revisions

Content deleted Content added
Undid revision 1261062988 by SleepTrain456 (talk) The opening date will be revealed on Dec 6: https://www.cbc.ca/news/canada/ottawa/trillium-line-2-opening-date-ottawa-1.7395952
Opening Jan 2025
Line 75:
["left terminus"] = "Bayview",
["right terminus"] = "Limebank",
["note-mid"] = "Reopens 20242025",
},
["3"] = {
Line 93:
["left terminus"] = "Airport",
["right terminus"] = "South Keys",
["note-mid"] = "Opens 20242025",
},
["Route 39"] = {