Development of tidal stream generators: Difference between revisions

Content deleted Content added
m Typo fixing, replaced: 10years → 10 years, The have → They have
Proteus AR1100 turbine installed in Japan
Line 97:
Proteus is a majority shareholder in {{Lang|fr|Normandie Hydroliennes}}'','' which is planning to deploy a 12&nbsp;MW pilot tidal farm at [[Raz Blanchard]] in 2025. The NH1 project will consist of four PMR AR3000 turbines, each rated at 3&nbsp;MW.<ref name=":40" /><ref>{{Cite web |last=Maksumic |first=Zerina |date=2024-10-04 |title=Proteus Marine Rewables' tidal energy system on track to slash costs, EIB confirms |url=https://www.offshore-energy.biz/proteus-marine-rewables-tidal-energy-system-on-track-to-slash-costs-eib-confirms/ |access-date=2024-10-12 |website=Offshore Energy |language=en-US}}</ref>
 
In August 2024, PMR started building an AR1100 turbine to be deployed in the Naru Strait to power the [[Gotō Islands]] in Japan. This is an upgrade of the AR500 turbine with added pitch and yaw mechanisms, and uprated to 1.1&nbsp;MW.<ref>{{Cite web |last=Maksumic |first=Zerina |date=2024-08-01 |title=Proteus Marine Renewables starts assembling upgraded tidal turbine in Japan (Gallery) |url=https://www.offshore-energy.biz/proteus-marine-renewables-starts-assembling-upgraded-tidal-turbine-in-japan-gallery/ |access-date=2024-10-12 |website=Offshore Energy |language=en-US}}</ref> The AR500 was previously tested in the Naru Strait from February 2021 to December 2023.<ref name=":15" /><ref name=":41" /> The AR1100 was installed in February 2025, using local vessels.<ref name=":43">{{Cite news |date=13 February 2025 |title=Proteus installs 1.1MW tidal turbine in Japan |url=https://renews.biz/98770/proteus-installs-11mw-tidal-turbine-in-japan/ |access-date=2025-02-15 |work=ReNEWS.biz}}</ref>
 
In November 2024, Proteus signed a [[Memorandum of understanding|MoU]] with [[SKF]] to supply the rotating equipment and [[GE Vernova]] to supply electrical systems for their tidal turbines.<ref name=":42" />
Line 467:
|{{Coord|32|50|N|128|54|E}}
|2021-02
|2023-12 {{NoteTag|Turbine to bewas upgraded and redeployed in February 2025 as the AR1100|name=Goto}}
|<ref name=":15" /><ref name=":41">{{Cite web |date=2024-01-03 |title=Tidal Energy Turbine Comes Ashore in Japan - Industrial News |url=https://industrialnews.co.uk/tidal-energy-turbine-comes-ashore-in-japan/,%20https://industrialnews.co.uk/tidal-energy-turbine-comes-ashore-in-japan/,%20https://www.oedigital.com/news/510528-tidal-energy-turbine-comes-ashore-in-japan |access-date=2024-01-14 |language=en-GB}}</ref>
|-
Line 498:
|Operational
|<ref name=":22" />
|-
|Proteus Marine Renewables, AR1100
|1.1
|{{Flag|Japan}}
|[[Naru Island (Japan)|Naru Island]]
|{{Coord|32|50|N|128|54|E}}
|2025-02
|Operational
|<ref name=":43" />
|}